Polaris completed another round of monitoring for remediation effectiveness and ecological recovery from the oil spill at Grand Bahama as a result of Hurricane Dorian in 2019. The same Caribbean pine showing over 70cm grow in a 6 month time period.
Polaris completed another round of monitoring for remediation effectiveness and ecological recovery from the oil spill at Grand Bahama as a result of Hurricane Dorian in 2019. The same Caribbean pine showing over 70cm grow in a 6 month time period.